New Factory Integration Strategy

Comprehensive VPSA oxygen generation systems designed for greenfield industrial projects, ensuring seamless synchronization with your production timeline.

Critical Challenges

The Complexity of Starting from Zero

Building a new facility requires a oxygen production system that is reliable, efficient, and ready on day one.

Absence of existing infrastructure necessitates a complete system build from the ground up.

Complex design requirements and long construction cycles often delay production starts.

Difficulty in equipment selection and lack of long-term maintenance guarantees.

Ensuring the oxygen system integrates perfectly with main production workflows.

factory professional oxygen plant services 1
400+
Global Projects
12.5k
Nm³/h Capacity
80%
Oxygen Purity
2m
Fast Construction
End-to-End Workflow

Full-Lifecycle Implementation Process

Phase 01

Solution Design

In-depth site surveys to analyze production scale, oxygen demand (flow, purity, pressure), and future expansion plans. We optimize design to minimize CAPEX and OPEX.

Phase 02

Installation Guidance

Dedicated on-site teams manage the entire installation process, from equipment lifting to precision welding and electrical wiring, ensuring strict adherence to quality standards.

Phase 03

Construction & Build

Integrated construction services with scientific scheduling. We synchronize oxygen station builds with the factory’s main project timeline using high-efficiency techniques.

Phase 04

Acceptance & Delivery

Multi-dimensional testing against national standards. We provide comprehensive technical documentation and staff training to ensure independent operation capability.

Phase 05

Operation & Maintenance

Long-term support including regular inspections, spare parts supply, and adsorbent replacement. We maintain detailed health records for every VPSA station.

Featured Case Study

Changjiang Steel: Rapid Industrial Deployment

To meet the oxygen enrichment needs of blast furnaces, PKU Pioneer designed and implemented a high-capacity VPSA oxygen station. By adopting a pre-machine enrichment route, the project maximized investment efficiency and operational benefits.

12,500 Nm³/h
Total Output
80%
Oxygen Purity
2 Months
Construction Time
Pre-Machine
Enrichment Route