New Factory Integration Strategy
Comprehensive VPSA oxygen generation systems designed for greenfield industrial projects, ensuring seamless synchronization with your production timeline.
The Complexity of Starting from Zero
Building a new facility requires a oxygen production system that is reliable, efficient, and ready on day one.
Absence of existing infrastructure necessitates a complete system build from the ground up.
Complex design requirements and long construction cycles often delay production starts.
Difficulty in equipment selection and lack of long-term maintenance guarantees.
Ensuring the oxygen system integrates perfectly with main production workflows.

Full-Lifecycle Implementation Process
Solution Design
In-depth site surveys to analyze production scale, oxygen demand (flow, purity, pressure), and future expansion plans. We optimize design to minimize CAPEX and OPEX.
Installation Guidance
Dedicated on-site teams manage the entire installation process, from equipment lifting to precision welding and electrical wiring, ensuring strict adherence to quality standards.
Construction & Build
Integrated construction services with scientific scheduling. We synchronize oxygen station builds with the factory’s main project timeline using high-efficiency techniques.
Acceptance & Delivery
Multi-dimensional testing against national standards. We provide comprehensive technical documentation and staff training to ensure independent operation capability.
Operation & Maintenance
Long-term support including regular inspections, spare parts supply, and adsorbent replacement. We maintain detailed health records for every VPSA station.
Changjiang Steel: Rapid Industrial Deployment
To meet the oxygen enrichment needs of blast furnaces, PKU Pioneer designed and implemented a high-capacity VPSA oxygen station. By adopting a pre-machine enrichment route, the project maximized investment efficiency and operational benefits.