{"id":3202,"date":"2018-08-20T00:00:00","date_gmt":"2018-08-20T00:00:00","guid":{"rendered":"https:\/\/new.ezask.cn\/news-information\/chinas-first-natural-gas-glycol-project\/"},"modified":"2026-04-21T09:41:15","modified_gmt":"2026-04-21T09:41:15","slug":"chinas-first-natural-gas-glycol-project","status":"publish","type":"post","link":"https:\/\/vpsatech.com\/id\/news-information\/chinas-first-natural-gas-glycol-project.html","title":{"rendered":"Tianying Petrochemical: Proyek Glikol Gas Alam Pertama China Berhasil Diuji"},"content":{"rendered":"<p>Pada pukul 18:18 tanggal 17 Agustus, Xinjiang Tianying Petrochemical Co., Ltd. memproduksi proyek etilen glikol 300.000 ton per tahun (fase pertama 150.000 ton\/tahun) dan berhasil melaksanakan uji coba, dan berhasil memproduksi etilen glikol yang sangat baik.<\/p>\n<p>Proyek ini berlokasi di Taman Industri Kedua Kota Alar, Xinjiang. Proyek ini diinvestasikan dan dibangun oleh Xinjiang Tianying Petrochemical Co., Ltd., yang didirikan oleh Perusahaan Investasi Korps Bawahan Korps Produksi dan Konstruksi Xinjiang. Ini adalah proyek konstruksi kimia pertama dari Perusahaan Investasi Korps. Dalam proyek ini, gas alam digunakan sebagai bahan baku untuk memproduksi produk seperti etilen glikol. Proyek ini dibangun dalam dua fase dengan total produksi 300.000 ton\/tahun etilen glikol. Saat ini fase pertama Proyek berjalan, dengan hasil tahunan 150.000 ton etilen glikol.<\/p>\n<p><a href=\"\/id\/\"><strong>Beijing Peking University Pioneer Technology Company<\/strong><\/a> telah membangun satu unit pemisahan PSA 16050Nm<sup>3<\/sup>\/jam, kemurnian 99% ( <a href=\"\/id\/PSA-CO\/\"><strong>PSA-CO<\/strong><\/a>) dan satu unit produksi hidrogen PSA 31200Nm<sup>3<\/sup>\/jam, kemurnian 99,9% (PSA-H2). Karena proyek ini terletak di pedalaman Xinjiang selatan, meskipun menghadapi kesulitan seperti iklim kering dan berpasir, transportasi yang tidak nyaman, kontrol transportasi barang berbahaya yang ketat, dll., Tim Teknik dan Teknologi Beijing Peking University Pioneer Technology Company terus memperbarui proyek, berusaha keras mengatasi banyak kesulitan, dan menyiapkan uji coba untuk pelanggan tepat waktu. Menyelesaikan pembuatan dan pemasangan unit PSA lebih awal, dan memproduksi CO dan H2 yang memenuhi syarat untuk memastikan seluruh lini Proyek Glikol Tianying Petrochemical (Fase I).<\/p>\n<p>Proyek ini memulai konstruksi pada 11 April 2016, dan menyelesaikan penyelesaian mekanis pada 26 Desember 2017. Pada Maret 2018, secara resmi memasuki uji coba setiap unit.<\/p>","protected":false},"excerpt":{"rendered":"<p>Pada pukul 18:18 tanggal 17 Agustus, Xinjiang Tianying Petrochemical Co., Ltd. memproduksi proyek etilen glikol 300.000 ton per tahun (fase pertama 150.000 ton\/tahun) dan berhasil melakukan uji coba, serta berhasil memproduksi etilen glikol unggul. Proyek ini berlokasi di Taman Industri Kedua Kota Alar, Xinjiang. Proyek ini diinvestasikan dan dibangun oleh\u2026<\/p>","protected":false},"author":1,"featured_media":2068,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_gspb_post_css":"","_kad_blocks_custom_css":"","_kad_blocks_head_custom_js":"","_kad_blocks_body_custom_js":"","_kad_blocks_footer_custom_js":"","_kad_post_transparent":"","_kad_post_title":"","_kad_post_layout":"","_kad_post_sidebar_id":"","_kad_post_content_style":"","_kad_post_vertical_padding":"","_kad_post_feature":"","_kad_post_feature_position":"","_kad_post_header":false,"_kad_post_footer":false,"_kad_post_classname":"","footnotes":""},"categories":[1],"tags":[],"class_list":["post-3202","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"acf":{"en-title":"","en-meta":"","en-content":"","es-title":"","es-meta":"","es-content":"","ru-title":"","ru-meta":"","ru-content":"","pt-title":"","pt-meta":"","pt-content":"","de-title":"","de-meta":"","de-content":"","th-title":"","th-meta":"","th-content":"","ja-title":"","ja-meta":"","ja-content":"","ko-title":"","ko-meta":"","ko-content":"","fr-title":"","fr-meta":"","fr-content":"","ar-title":"","ar-meta":"","ar-content":"","id-title":"","id-meta":"","id-content":""},"taxonomy_info":{"category":[{"value":1,"label":"Uncategorized"}]},"featured_image_src_large":["https:\/\/vpsatech.com\/wp-content\/uploads\/2026\/04\/5bf52cf23b669.jpg",588,466,false],"author_info":{"display_name":"yiyunyingalex","author_link":"https:\/\/vpsatech.com\/id\/author\/yiyunyingalex"},"comment_info":0,"category_info":[{"term_id":1,"name":"Uncategorized","slug":"uncategorized","term_group":0,"term_taxonomy_id":1,"taxonomy":"category","description":"","parent":0,"count":194,"filter":"raw","cat_ID":1,"category_count":194,"category_description":"","cat_name":"Uncategorized","category_nicename":"uncategorized","category_parent":0}],"tag_info":false,"_links":{"self":[{"href":"https:\/\/vpsatech.com\/id\/wp-json\/wp\/v2\/posts\/3202","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/vpsatech.com\/id\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/vpsatech.com\/id\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/vpsatech.com\/id\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/vpsatech.com\/id\/wp-json\/wp\/v2\/comments?post=3202"}],"version-history":[{"count":2,"href":"https:\/\/vpsatech.com\/id\/wp-json\/wp\/v2\/posts\/3202\/revisions"}],"predecessor-version":[{"id":3556,"href":"https:\/\/vpsatech.com\/id\/wp-json\/wp\/v2\/posts\/3202\/revisions\/3556"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/vpsatech.com\/id\/wp-json\/wp\/v2\/media\/2068"}],"wp:attachment":[{"href":"https:\/\/vpsatech.com\/id\/wp-json\/wp\/v2\/media?parent=3202"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/vpsatech.com\/id\/wp-json\/wp\/v2\/categories?post=3202"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/vpsatech.com\/id\/wp-json\/wp\/v2\/tags?post=3202"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}